(I) Pre-Installation Checklist
1.Professional Installation Recommendation: Hire a licensed plumber or professional team to ensure compliance with local codes.
2.Product Inspection: Verify all components (valve body, showerheads, panels, etc.) are intact and undamaged.
3.Utility Preparation: Plan cold/hot water pipe connections (spacing must match product specs) and预留 electrical outlets (if equipped with smart温控).
(II) Required Tools
(III) Pre-Installation Steps
2.Embedding the embedded part: Secure the concealed valve embedded part in the groove, aligning horizontally with a spirit level.
3. Pipe Connection: Attach cold/hot water pipes to the embedded part connectors, sealing threads with PTFE tape to prevent leaks.
(IV) Standard Installation Process
2.Showerhead Bracket Installation: Fix overhead and handheld shower brackets at desired heights.
3.Panel Mounting: Align the operation panel with the embedded part connectors, gently press to secure, and connect temperature control wires (if applicable).
4. Showerhead Connection: Attach showerheads to the outlet pipes, ensuring silicone gaskets are properly seated.
(V) Functional Testing & Checks
2.Leakage Inspection: Shut off the water supply and monitor all joints for dripping.
3.Pressure Test: Evaluate showerhead stability under high-pressure water flow.
(VI) Common Issues & Solutions
2.Tilted Panel: Adjust theembedded part position or add shims to achieve horizontal alignment.
3.Leakage: Retighten connections or replace worn-out seals.
(VII) Safety Tips & Maintenance
2.Regular Maintenance: Quarterly inspect pipe seals and clean showerhead nozzles.
3.Professional After-sales: Contact the authorized Chinese faucet factory service team for repairs.