{"id":24183,"date":"2026-09-09T19:02:04","date_gmt":"2026-09-09T11:02:04","guid":{"rendered":"https:\/\/www.yoroow.com\/?p=24183"},"modified":"2026-09-09T19:02:04","modified_gmt":"2026-09-09T11:02:04","slug":"why-faucet-lead-time-should-be-managed-before-the-purchase-order","status":"publish","type":"post","link":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/","title":{"rendered":"Why Faucet Lead Time Should Be Managed Before the Purchase Order"},"content":{"rendered":"<p>Lead time is often calculated from the PO date.<\/p>\n<p>However, for faucets with more complex configurations, many decisions that affect the actual lead time happen before the PO is issued.<\/p>\n<p>An unfinished product configuration, an unconfirmed special finish, or packaging details still under revision can already consume part of the delivery window before formal production begins.<\/p>\n<h2>Why Luxury Shower Faucets Have More Pre-Production Lead Time<\/h2>\n<p>A <a href=\"https:\/\/www.yoroow.com\/de\/produktkategorie\/dusche\/\"><strong>Luxury Shower Faucet<\/strong><\/a> often includes more than one main component.<\/p>\n<p>For example, a <strong>luxury shower faucet set<\/strong> may include the control body, overhead shower, hand shower, hose, connectors, and other components.<\/p>\n<p>This means that one product line on a PO may actually represent several parts that need preparation at the same time.<\/p>\n<p>If a key component remains undecided until around the PO date, it may affect the preparation schedule for the entire set.<\/p>\n<p>So when evaluating lead time, buyers should not only ask:<\/p>\n<p><strong>\u201cHow long does production take?\u201d<\/strong><\/p>\n<p>They should also check how many conditions remain unresolved before production can begin.<\/p>\n<p>For a shower set, it also helps to separate routine confirmation items from issues on the critical path. A minor label-text revision may not affect production. An unconfirmed key component that requires new preparation can have a much greater impact.<\/p>\n<h2>Special Finishes Move the Timeline Forward<\/h2>\n<p>For a <strong>luxury bathroom shower faucet<\/strong>, the finish often plays an important role in the product positioning.<\/p>\n<p>Standard configurations usually follow a clearer preparation process. Special finishes require earlier confirmation of which components need the same surface treatment and how the complete set should look.<\/p>\n<p>A Shower System may contain several exposed parts with different shapes and functions. Finish confirmation therefore involves more than choosing the color of the main body. The entire set needs a clear and consistent finish requirement.<\/p>\n<p>Until these details are fixed, the remaining time cannot simply be treated as normal production lead time.<\/p>\n<p>Issuing a PO on schedule does not necessarily mean that every production condition is ready on that day.<\/p>\n<h2>Packaging Is Also Part of Lead Time<\/h2>\n<p>Packaging often appears to be a later production step, but custom packaging may require earlier preparation.<\/p>\n<p>A <a href=\"https:\/\/www.alibaba.com\/product-detail\/High-Quality-Aluminum-Thermostatic-Shower-Mixer_1601356247604.html?spm=a2700.shop_plgr.41413.28.5deb2635cQLVzh\"><strong>Luxury Shower Faucet<\/strong><\/a> contains several components, so the packaging structure needs to match the final configuration. Cartons, labels, and other packaging materials also depend on confirmed product information.<\/p>\n<p>If the product is ready for production but the packaging remains unconfirmed, the lead-time risk has only moved from the product side to the packaging side.<\/p>\n<p>When the product configuration changes, buyers should also check whether the original inserts, accessory positions, and label information still work.<\/p>\n<p><a href=\"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-20607 aligncenter\" src=\"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg\" alt=\"\" width=\"500\" height=\"500\" srcset=\"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg 500w, https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7-300x300.jpg 300w, https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7-150x150.jpg 150w, https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7-12x12.jpg 12w, https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7-100x100.jpg 100w, https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7-50x50.jpg 50w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<h2>Build a \u201cReady for Production\u201d Status Before the PO<\/h2>\n<p>Effective lead-time management can start by checking several conditions before issuing the PO:<\/p>\n<ul>\n<li>Is the final configuration clear?<\/li>\n<li>Is the special finish confirmed?<\/li>\n<li>Are the key components confirmed?<\/li>\n<li>Are the packaging requirements clear enough?<\/li>\n<\/ul>\n<p>This does not mean every detail must be completed before the PO. The important point is to know what remains unfinished and whether it affects the critical delivery path.<\/p>\n<p>This gives buyers a more realistic Lead Time.<\/p>\n<p>For a complex <strong>luxury bath faucet<\/strong>, lead-time risk rarely appears on a single day. It usually develops from several small decisions that remain unresolved for too long.<\/p>\n<p>Instead of asking only:<\/p>\n<p><strong>\u201cHow many days will it take after the PO?\u201d<\/strong><\/p>\n<p>buyers should ask earlier:<\/p>\n<p><strong>\u201cWhat could prevent production from starting as planned before the PO is issued?\u201d<\/strong><\/p>\n<p>Real Faucet Lead Time management should begin before the Purchase Order.<\/p>\n<h2>Why Small-Batch Trial Sales Are a Safer Approach: Luxury Shower Faucets<\/h2>\n<p>When a <strong>Luxury Shower Faucet<\/strong> is used in applications involving potable water, material declarations should not be treated as equivalent to the health-effects evaluation of the complete product. According to NSF, <strong>NSF\/ANSI\/CAN 372<\/strong> addresses weighted lead content, generally limiting it to <strong>0.25% for wetted surfaces<\/strong>. In contrast, <strong>NSF\/ANSI\/CAN 61<\/strong> focuses on the potential health effects of substances that may leach from materials or finished products when they come into contact with drinking water.<\/p>\n<p>NSF certification information also highlights an important distinction: certification of individual components does <strong>not automatically mean that the fully assembled faucet is certified<\/strong>.<\/p>\n<h3>References<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.nsf.org\/knowledge-library\/nsf-ansi-can-372-technical-requirements?utm_source=chatgpt.com\">NSF \u2013 NSF\/ANSI\/CAN 372 Technical Requirements<\/a><\/li>\n<li><a href=\"https:\/\/www.nsf.org\/consumer-resources\/articles\/faucets-plumbing-products?utm_source=chatgpt.com\">NSF \u2013 Faucets and Plumbing Products \/ NSF\/ANSI 61<\/a><\/li>\n<li><a href=\"https:\/\/www.nsf.org\/knowledge-library\/nsf-ansi-can-61-section-9-mechanical-plumbing-devices?utm_source=chatgpt.com\">NSF\/ANSI\/CAN 61 Section 9 \u2013 Mechanical Plumbing Devices<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Lead time is often calculated from the PO date. However, for faucets with more complex configurations, many decisions&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_kad_post_transparent":"default","_kad_post_title":"default","_kad_post_layout":"default","_kad_post_sidebar_id":"","_kad_post_content_style":"default","_kad_post_vertical_padding":"default","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"categories":[243],"tags":[8220],"class_list":["post-24183","post","type-post","status-publish","format-standard","hentry","category-faucet-factory","tag-luxury-shower-faucet"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.4 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Why Faucet Lead Time Should Be Managed Before the Purchase Order - YOROOW<\/title>\n<meta name=\"description\" content=\"Faucet lead-time risk often starts before the PO. Learn how finish, configuration and packaging decisions can affect the real production schedule.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Why Faucet Lead Time Should Be Managed Before the Purchase Order\" \/>\n<meta property=\"og:description\" content=\"Faucet lead-time risk often starts before the PO. Learn how finish, configuration and packaging decisions can affect the real production schedule.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/\" \/>\n<meta property=\"og:site_name\" content=\"YOROOW\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/yoroowfaucetfactory\/61564236752362\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-09T11:02:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"500\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"YOROOW\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"YOROOW\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"4\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/\"},\"author\":{\"name\":\"YOROOW\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#\\\/schema\\\/person\\\/471edb9b9d298fe09e80cb00886f646c\"},\"headline\":\"Why Faucet Lead Time Should Be Managed Before the Purchase Order\",\"datePublished\":\"2026-09-09T11:02:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/\"},\"wordCount\":715,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.yoroow.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/2-7.jpg\",\"keywords\":[\"Luxury Shower Faucet\"],\"articleSection\":[\"Faucet Factory\"],\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/\",\"url\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/\",\"name\":\"Why Faucet Lead Time Should Be Managed Before the Purchase Order - YOROOW\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.yoroow.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/2-7.jpg\",\"datePublished\":\"2026-09-09T11:02:04+00:00\",\"description\":\"Faucet lead-time risk often starts before the PO. Learn how finish, configuration and packaging decisions can affect the real production schedule.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.yoroow.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/2-7.jpg\",\"contentUrl\":\"https:\\\/\\\/www.yoroow.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/2-7.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"home\",\"item\":\"https:\\\/\\\/www.yoroow.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why Faucet Lead Time Should Be Managed Before the Purchase Order\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/\",\"name\":\"YOROOW\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#organization\",\"name\":\"YOROOW\",\"url\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.yoroow.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/2024123007131061.png\",\"contentUrl\":\"https:\\\/\\\/www.yoroow.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/2024123007131061.png\",\"width\":168,\"height\":27,\"caption\":\"YOROOW\"},\"image\":{\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/yoroowfaucetfactory\\\/61564236752362\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/#\\\/schema\\\/person\\\/471edb9b9d298fe09e80cb00886f646c\",\"name\":\"YOROOW\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/23f3557048821efd797eac3a8d03ea9da2d90c8fbd1100095500870b5bc62b12?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/23f3557048821efd797eac3a8d03ea9da2d90c8fbd1100095500870b5bc62b12?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/23f3557048821efd797eac3a8d03ea9da2d90c8fbd1100095500870b5bc62b12?s=96&d=mm&r=g\",\"caption\":\"YOROOW\"},\"sameAs\":[\"https:\\\/\\\/www.yoroow.com\"],\"url\":\"https:\\\/\\\/www.yoroow.com\\\/de\\\/blog-detail\\\/author\\\/yoroow\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Why Faucet Lead Time Should Be Managed Before the Purchase Order - YOROOW","description":"Faucet lead-time risk often starts before the PO. Learn how finish, configuration and packaging decisions can affect the real production schedule.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/","og_locale":"de_DE","og_type":"article","og_title":"Why Faucet Lead Time Should Be Managed Before the Purchase Order","og_description":"Faucet lead-time risk often starts before the PO. Learn how finish, configuration and packaging decisions can affect the real production schedule.","og_url":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/","og_site_name":"YOROOW","article_publisher":"https:\/\/www.facebook.com\/people\/yoroowfaucetfactory\/61564236752362\/","article_published_time":"2026-09-09T11:02:04+00:00","og_image":[{"width":500,"height":500,"url":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg","type":"image\/jpeg"}],"author":"YOROOW","twitter_card":"summary_large_image","twitter_misc":{"Verfasst von":"YOROOW","Gesch\u00e4tzte Lesezeit":"4\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#article","isPartOf":{"@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/"},"author":{"name":"YOROOW","@id":"https:\/\/www.yoroow.com\/de\/#\/schema\/person\/471edb9b9d298fe09e80cb00886f646c"},"headline":"Why Faucet Lead Time Should Be Managed Before the Purchase Order","datePublished":"2026-09-09T11:02:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/"},"wordCount":715,"commentCount":0,"publisher":{"@id":"https:\/\/www.yoroow.com\/de\/#organization"},"image":{"@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#primaryimage"},"thumbnailUrl":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg","keywords":["Luxury Shower Faucet"],"articleSection":["Faucet Factory"],"inLanguage":"de","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/","url":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/","name":"Why Faucet Lead Time Should Be Managed Before the Purchase Order - YOROOW","isPartOf":{"@id":"https:\/\/www.yoroow.com\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#primaryimage"},"image":{"@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#primaryimage"},"thumbnailUrl":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg","datePublished":"2026-09-09T11:02:04+00:00","description":"Faucet lead-time risk often starts before the PO. Learn how finish, configuration and packaging decisions can affect the real production schedule.","breadcrumb":{"@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#primaryimage","url":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg","contentUrl":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2025\/05\/2-7.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.yoroow.com\/de\/blog-detail\/why-faucet-lead-time-should-be-managed-before-the-purchase-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"home","item":"https:\/\/www.yoroow.com\/"},{"@type":"ListItem","position":2,"name":"Why Faucet Lead Time Should Be Managed Before the Purchase Order"}]},{"@type":"WebSite","@id":"https:\/\/www.yoroow.com\/de\/#website","url":"https:\/\/www.yoroow.com\/de\/","name":"YOROOW","description":"","publisher":{"@id":"https:\/\/www.yoroow.com\/de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.yoroow.com\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Organization","@id":"https:\/\/www.yoroow.com\/de\/#organization","name":"YOROOW","url":"https:\/\/www.yoroow.com\/de\/","logo":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.yoroow.com\/de\/#\/schema\/logo\/image\/","url":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2024\/12\/2024123007131061.png","contentUrl":"https:\/\/www.yoroow.com\/wp-content\/uploads\/2024\/12\/2024123007131061.png","width":168,"height":27,"caption":"YOROOW"},"image":{"@id":"https:\/\/www.yoroow.com\/de\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/people\/yoroowfaucetfactory\/61564236752362\/"]},{"@type":"Person","@id":"https:\/\/www.yoroow.com\/de\/#\/schema\/person\/471edb9b9d298fe09e80cb00886f646c","name":"YOROOW","image":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/secure.gravatar.com\/avatar\/23f3557048821efd797eac3a8d03ea9da2d90c8fbd1100095500870b5bc62b12?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/23f3557048821efd797eac3a8d03ea9da2d90c8fbd1100095500870b5bc62b12?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/23f3557048821efd797eac3a8d03ea9da2d90c8fbd1100095500870b5bc62b12?s=96&d=mm&r=g","caption":"YOROOW"},"sameAs":["https:\/\/www.yoroow.com"],"url":"https:\/\/www.yoroow.com\/de\/blog-detail\/author\/yoroow\/"}]}},"_links":{"self":[{"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/posts\/24183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/comments?post=24183"}],"version-history":[{"count":1,"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/posts\/24183\/revisions"}],"predecessor-version":[{"id":24188,"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/posts\/24183\/revisions\/24188"}],"wp:attachment":[{"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/media?parent=24183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/categories?post=24183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yoroow.com\/de\/wp-json\/wp\/v2\/tags?post=24183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}